Importing Steel Products from China: A Step-by-Step Compliance Guide
Quality control should not be a single inspection at the end. Build a multi-point QC plan: (1) raw material inspection before production starts, (2) first article inspection when the first unit comes off the line, (3) in-process inspection at 30% and 60% completion, (4) pre-shipment inspection when 80% is packed, (5) container loading supervision. Each step costs a fraction of catching defects at the destination.
MOQ negotiation is an art. Chinese factories quote high MOQs because they're designed for mass production efficiency. To negotiate lower MOQs, offer: (1) a slightly higher unit price, (2) a commitment to repeat orders totaling the annual MOQ, (3) payment of mold/tooling costs upfront, or (4) acceptance of the factory's standard raw material sizes. The most effective approach combines multiple offers.
Payment terms follow a standard progression in China. Transaction 1: 30% deposit, 70% before shipment. Transaction 2-3: 30% deposit, 70% against B/L copy. After 1 year: possible 30% deposit, 70% 30 days after B/L date. L/C at sight is standard for large transactions. Never jump ahead in this progression — let the track record justify each step. Trust is earned through consistent performance.