The Complete Guide to Payment Terms When Importing from China
Sample development has three stages with different costs. Stage 1 — existing sample or stock item: free or low cost, typically 1-3 days. Stage 2 — modified sample based on existing design: medium cost, 5-10 days. Stage 3 — fully custom sample: highest cost, 15-30 days. Many buyers skip to Stage 3 when Stage 1 or 2 would suffice. Save your custom development budget for when it truly matters.
Quality control should not be a single inspection at the end. Build a multi-point QC plan: (1) raw material inspection before production starts, (2) first article inspection when the first unit comes off the line, (3) in-process inspection at 30% and 60% completion, (4) pre-shipment inspection when 80% is packed, (5) container loading supervision. Each step costs a fraction of catching defects at the destination.
Payment terms follow a standard progression in China. Transaction 1: 30% deposit, 70% before shipment. Transaction 2-3: 30% deposit, 70% against B/L copy. After 1 year: possible 30% deposit, 70% 30 days after B/L date. L/C at sight is standard for large transactions. Never jump ahead in this progression — let the track record justify each step. Trust is earned through consistent performance.