返回

Importing Food Products from China: FDA, HACCP, and Labeling Requirements

English communication ability often correlates with export maturity but is not a substitute for it. A factory with poor English but good systems and a reliable trading partner can outperform a factory with fluent English but weak processes. Judge suppliers on their systems and track record, not on their language skills. The best factories invest in quality control, not just sales teams.

Sample development has three stages with different costs. Stage 1 — existing sample or stock item: free or low cost, typically 1-3 days. Stage 2 — modified sample based on existing design: medium cost, 5-10 days. Stage 3 — fully custom sample: highest cost, 15-30 days. Many buyers skip to Stage 3 when Stage 1 or 2 would suffice. Save your custom development budget for when it truly matters.

Incoterms 2026 clarified several points that often caused confusion. Under FOB, the seller's responsibility ends when goods are loaded on the vessel. Under CIF, the seller arranges and pays for freight and insurance but risk transfers at the port of origin. DDP means the seller bears all costs and risks until delivery. Choose based on your logistics capability, not habit. CIF seems easier but you lose control of shipping decisions.

Factory audits should cover five dimensions: (1) quality management system — do they have documented procedures and follow them? (2) production capability — can their equipment achieve your tolerances? (3) social compliance — are working conditions acceptable? (4) financial health — are they stable enough to complete your order? (5) export experience — have they shipped similar products to your market? A one-day audit can assess all five with a proper checklist.

0 次点赞0 次收藏

评论 · 0

登录后参与评论

暂无评论,来写下第一条吧