The Complete Guide to Testing Lab Samples Before Production

When inspection finds defects, the response protocol matters. First, separate defective from good units. Second, photograph and document each defect type with measurements. Third, notify the factory immediately and pause affected production lines. Fourth, agree on a rework plan and timeline. Fifth, re-inspect after rework before accepting. Don't let the factory rush you — proper corrective action at this stage prevents repeat issues.

The 5-point quality control system is the industry standard for China manufacturing. Point 1: Raw Material QC — verify incoming materials against specifications before production. Point 2: In-Process QC — inspect during production, not just at the end. Point 3: Pre-Shipment QC — random sampling before container loading. Point 4: Loading Supervision — confirm quantity, packaging, and marks. Point 5: Corrective Action — when defects are found, ensure the factory implements permanent fixes, not quick patches.

Photographic documentation during inspection serves multiple purposes. It provides evidence for disputes, reference for future orders, and training material for your team. Key photos include: overall factory condition, raw material storage, production line setup, in-process work, finished goods (good and defective), packaging, labels and markings, and container loading. A well-documented inspection is worth ten times an undocumented one.

0 次点赞0 次收藏

评论 · 0

登录后参与评论

暂无评论,来写下第一条吧