The Ultimate Guide to Chinese Factory Audits for Foreign Buyers
Quality control should not be a single inspection at the end. Build a multi-point QC plan: (1) raw material inspection before production starts, (2) first article inspection when the first unit comes off the line, (3) in-process inspection at 30% and 60% completion, (4) pre-shipment inspection when 80% is packed, (5) container loading supervision. Each step costs a fraction of catching defects at the destination.
Sample development has three stages with different costs. Stage 1 — existing sample or stock item: free or low cost, typically 1-3 days. Stage 2 — modified sample based on existing design: medium cost, 5-10 days. Stage 3 — fully custom sample: highest cost, 15-30 days. Many buyers skip to Stage 3 when Stage 1 or 2 would suffice. Save your custom development budget for when it truly matters.
English communication ability often correlates with export maturity but is not a substitute for it. A factory with poor English but good systems and a reliable trading partner can outperform a factory with fluent English but weak processes. Judge suppliers on their systems and track record, not on their language skills. The best factories invest in quality control, not just sales teams.