Importing to Latin America: Documentation, Tariffs, and Logistics from China
Quality control should not be a single inspection at the end. Build a multi-point QC plan: (1) raw material inspection before production starts, (2) first article inspection when the first unit comes off the line, (3) in-process inspection at 30% and 60% completion, (4) pre-shipment inspection when 80% is packed, (5) container loading supervision. Each step costs a fraction of catching defects at the destination.
Factory audits should cover five dimensions: (1) quality management system — do they have documented procedures and follow them? (2) production capability — can their equipment achieve your tolerances? (3) social compliance — are working conditions acceptable? (4) financial health — are they stable enough to complete your order? (5) export experience — have they shipped similar products to your market? A one-day audit can assess all five with a proper checklist.
The sourcing cycle from initial contact to first shipment typically takes 3-6 months for new products. Month 1: supplier research and initial contact. Month 2: sample development and evaluation. Month 3: negotiation and order placement. Month 4: production (varies by product). Month 5: inspection and shipping. Month 6: delivery and evaluation. Plan your inventory accordingly and don't expect to compress this timeline without cutting corners.
Payment terms follow a standard progression in China. Transaction 1: 30% deposit, 70% before shipment. Transaction 2-3: 30% deposit, 70% against B/L copy. After 1 year: possible 30% deposit, 70% 30 days after B/L date. L/C at sight is standard for large transactions. Never jump ahead in this progression — let the track record justify each step. Trust is earned through consistent performance.