返回

How to Source Sustainable Packaging Materials from China

Tariff classification (HS code) determines your duty rate. Different suppliers may classify the same product under different HS codes. Always verify the correct HS code and check if your product qualifies for preferential duty rates under trade agreements. An incorrect classification can result in overpayment or customs penalties. Request the supplier's export HS code and compare it with your import country's classification.

The sourcing cycle from initial contact to first shipment typically takes 3-6 months for new products. Month 1: supplier research and initial contact. Month 2: sample development and evaluation. Month 3: negotiation and order placement. Month 4: production (varies by product). Month 5: inspection and shipping. Month 6: delivery and evaluation. Plan your inventory accordingly and don't expect to compress this timeline without cutting corners.

MOQ negotiation is an art. Chinese factories quote high MOQs because they're designed for mass production efficiency. To negotiate lower MOQs, offer: (1) a slightly higher unit price, (2) a commitment to repeat orders totaling the annual MOQ, (3) payment of mold/tooling costs upfront, or (4) acceptance of the factory's standard raw material sizes. The most effective approach combines multiple offers.

Incoterms 2026 clarified several points that often caused confusion. Under FOB, the seller's responsibility ends when goods are loaded on the vessel. Under CIF, the seller arranges and pays for freight and insurance but risk transfers at the port of origin. DDP means the seller bears all costs and risks until delivery. Choose based on your logistics capability, not habit. CIF seems easier but you lose control of shipping decisions.

0 次点赞0 次收藏

评论 · 0

登录后参与评论

暂无评论,来写下第一条吧