返回

How to Import Chemical Products: MSDS, UN Numbers, and Dangerous Goods

The sourcing cycle from initial contact to first shipment typically takes 3-6 months for new products. Month 1: supplier research and initial contact. Month 2: sample development and evaluation. Month 3: negotiation and order placement. Month 4: production (varies by product). Month 5: inspection and shipping. Month 6: delivery and evaluation. Plan your inventory accordingly and don't expect to compress this timeline without cutting corners.

Quality control should not be a single inspection at the end. Build a multi-point QC plan: (1) raw material inspection before production starts, (2) first article inspection when the first unit comes off the line, (3) in-process inspection at 30% and 60% completion, (4) pre-shipment inspection when 80% is packed, (5) container loading supervision. Each step costs a fraction of catching defects at the destination.

Incoterms 2026 clarified several points that often caused confusion. Under FOB, the seller's responsibility ends when goods are loaded on the vessel. Under CIF, the seller arranges and pays for freight and insurance but risk transfers at the port of origin. DDP means the seller bears all costs and risks until delivery. Choose based on your logistics capability, not habit. CIF seems easier but you lose control of shipping decisions.

Total landed cost is the only number that matters when comparing Chinese suppliers. It includes: factory price, inland freight to port, export customs fees, ocean/air freight, insurance, import duties, VAT, customs brokerage, and inland freight from destination port. A $10 product FOB can easily become $14-16 landed. Most first-time importers forget at least three cost components and end up with negative margins.

0 次点赞0 次收藏

评论 · 0

登录后参与评论

暂无评论,来写下第一条吧